Tuesday, March 14, 2017

Sidework

There are several things that need to be done each day in order to get ready to work in the Garden. This is called:

Opening Sidework

  • Unlock Doors
  • Pull all 3 wagons outside
  • Bring Workmate Table outside
  • Take chairs outside
  • Each person get safety glasses

There are several things that need to be done at the end of each class period. This is called

Shift Sidework (last 5 minutes of class)

  • Put back safety glasses
  • Put away all drill bits
  • Put away drills
  • Hang up all tools
  • Put scrap wood into wood pile
  • Put away all projects
  • One minute trash pick up

There are several things that need to be done each day at the end of the day. This is called:

Closing Sidework

  • Put back safety glasses
  • Put away all drill bits
  • Hang up all tools
  • Put scrap wood into wood pile
  • Put away all projects
  • Three minute trash pickup
  • Sweep C Train
  • Put workmate away
  • Put wagons away

No comments:

Post a Comment