Friday, March 10, 2017

C Train Storage Project Phase 4

6 Inch Cylinders Honey. 6 Inches!

Maintenance gave us a 3 inch diameter piece of PVC pipe that we are cutting into 6 inch sections to hold our safety goggles. YAY!!!

The PVC is not easy to cut through.


They have to be sanded too.






We need the floor to be able to be swept each day, so we needed a Shelf for the Shadecloth.


Before:


The Plans:


During:



After:




Check out the plans and prototype for the backpack holders!

Here are the plans:

Here is the prototype:

Production Begins:



No comments:

Post a Comment